For this project we had to remove the old shingles and install new shingles. Then we finished with the flashing one the left.
For this project we had to tear down the wall and the tile work to give the client more space in the bathroom, a new look, and to be able to install a slide door.
The bathroom started looking like this once the new tile work was done. As you can see, we added a shower niche.
After the tile work was finished and we had put the water proof and sealant, we proceeded to put the new slide door.
Deck Remodeling Work
We remodeled the entire basement:
Installed the Flooring
Installed the doors
Installed the Insulation and Drywall
Painted the Entire Basement
Installed the Shoe Molding and the Door Thresholds.
Installed the Kitchen Cabinets and the Sink
Created Small Closet